S.N. |
Items |
Description |
1. |
Project Name |
Bheri Babai Diversion Multipurpose Project |
2. |
Location |
Bheri Ganga Municipality of Surkhet District, Karnali Province |
3. |
Type of project |
Run-of-the-River (ROR) Type |
4. |
Command Area |
51,000.00 Ha |
5. |
Hydrology at intake |
|
Catchment area |
12062 km2 |
|
100 year flood (Q100) |
5698 m3/s |
|
Design flood (Q1000) |
7532 m3/s |
|
Mean monthly flow |
331.89 m3/s |
|
Minimum monthly flow |
75.68 m3/s |
6. |
Headworks |
|
Type |
Barrage System with 6 Radial Gates |
|
Operating level/Pond level |
455.00 masl |
|
High flood level (For Q100) |
453.58 masl (All gates open condition) |
|
High flood level (For Q1000) |
455.95 masl (All gates open condition) |
|
Crest elevation |
442.50 masl |
|
Radial gate Size |
6 nos 15.30 m Width × 13.0 m Height each |
|
Intake type |
Side intake on the left bank |
|
Intake orifice size |
6 nos. 4.5 m Width × 3.0 m Height each |
7. |
Diversion during construction |
|
Diversion flood (1 in 20 years dry season flow) |
574.06 m3/s |
8. |
Approach Canals |
|
Number |
3 nos. |
|
Average Length |
43.15 m |
|
Type |
Rectangular type |
9. |
Settling basin |
|
Type |
Surface settling basin |
|
Particle size to be removed |
0.2 mm |
|
Number |
3 bays |
|
Length of uniform section |
115.0 m |
|
Total length including transitions |
157.40 m |
|
Width |
15.0 m each |
|
Height |
6.65 m |
|
Flushing Efficiency |
90 % |
|
Flushing system |
Intermittent flushing system |
10. |
Waterways |
10.1 |
Headrace Tunnel |
|
Length |
12,174 m |
|
Type |
Circular; Concrete lined |
|
Cross section |
Internal Finished Diameter 4.20 m |
10.2 |
Surge Shaft |
|
Type |
Restricted orifice with upper expansion chamber type |
|
Internal equivalent circular diameter |
12.50 m |
|
Area of upper expansion chamber |
380.00 m2 |
|
Height |
58 m |
10.3 |
Penstock |
|
Material |
Mild steel (ASTM A516 Grade 60) |
|
Length before trifurcation |
Total 808m, (Inside Tunnel 100 m, Surface 85 m, Buried 623 m) |
|
Length after trifurcation |
Total 75m, (27.0 m, 21.0 m, 27.0 m with 2.72 m in diameter) |
|
Internal diameter |
3.85 m |
|
Thickness of pipe |
14 to 36 mm |
11. |
Powerhouse |
|
Powerhouse type |
Surface |
|
Outer Dimension of PH |
51.25 m long and 16 m wide. |
12. |
Tailrace |
|
Design Tailwater level |
307.72masl |
|
Type |
Rectangular RCC box culvert |
|
No |
3 nos |
|
Length |
21.85 m |
|
Size |
4.6 m wide ×3.3 m high |
|
100 year flood (Q100) in Babai River |
4879.0 m3/s |
|
Design flood (Q1000) in powerhosue |
6761.0 m3/s |
13. |
Turbine |
|
Turbine type |
Vertical Axis Francis Turbine |
|
Number of units |
3 Numbers (One spare unit) |
|
Rated speed, n |
375 rpm |
|
Turbine Axis Level |
306.72 masl |
14. |
Power and energy output |
|
Gross head |
147.28 m |
|
Rated net head |
130.59 m |
|
Design discharge |
40.0 m3/s |
|
Installed capacity |
46.72 MW |
|
Total estimated annual energy |
384.51 GWh |
15. |
Transmission line |
|
Voltage |
132 kV |
|
Length |
5.0 km |
16. |
Switchyard |
|
Dimension (L × B) |
40 m × 37 m |
|
Voltage level |
132 kV |
|
Type |
Outdoor AIS |
17. |
Project Cost |
|
|
Total Cost in NRs. |
29,97,000,0000 |
18. |
B/C Ratio |
1.92 |
19. |
EIRR |
16.65% |